Rev. 2.0
Maintenance Guide
9-7
9-1-3. Adjusting the Speed Controller of the Bank-Up Cylinder
(Optional Replacement Table)
1) For the speed controllers of the right side cylinder, adjust those of the fixed and left side
cylinders.
2) The speed controllers have been set so that the bank-up cylinder completes ascent operation
in 3.5 to 4.0 seconds, descent operation in 2.5 to 3.0 seconds. (When assembled)
UP speed : To be adjusted by the upper speed controller.
If the up speed of the left cylinder is too fast, turn the speed controller
adjustment screw clockwise.
DOWN speed: To be adjusted by the lower speed controller.
If the down speed of the left cylinder is too fast, turn the speed controller
adjustment screw clockwise.
3) If the up and down speeds of the left and right cylinders are the same, lock the adjustment
screws of the speed controllers with the lock screws.
4) After the adjustment screws have been locked, recheck the up and down speeds.
Upper speed
controller
Lower speed
controller
Figure 9-1-3 Back-Up Cylinder Positions

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the JUKI KE-3020V and is the answer not in the manual?

JUKI KE-3020V Specifications

General IconGeneral
BrandJUKI
ModelKE-3020V
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals