EasyManuals Logo
Home>Mercury>Engine>200XRI

Mercury 200XRI User Manual

Mercury 200XRI
631 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #49 background imageLoading...
Page #49 background image
OUTBOARD MOTOR INSTALLATION
Page 1D-12 90-883728 JULY 2001
d. Return remote control handle to neutral. The propeller should turn freely without
drag. If not, adjust barrel closer to cable end guide. Repeat steps a thru d.
Throttle Cable
INSTALLATION
1. Position remote control into neutral.
N
2. Attach throttle cable to the throttle lever. Secure with washer and locknut.
a
57838
a-Washer and Locknut
3. Adjust the cable barrel so that the installed throttle cable will hold the idle stop screw
against the stop.
a
b
57838
a-Cable Barrel – Adjust To Hold Idle Stop Screw Against Stop
b-Idle Stop Screw
4. Check throttle cable adjustment as follows:
a. Shift outboard into gear a few times to activate the throttle linkage. Make sure to
rotate the propeller shaft while shifting into reverse.
N
R
F

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mercury 200XRI and is the answer not in the manual?

Mercury 200XRI Specifications

General IconGeneral
BrandMercury
Model200XRI
CategoryEngine
LanguageEnglish

Related product manuals