Installation 15088: J 10/22/99
Step 1
Remove the two screws in the bottom
left corner of the MPS-24A or MPS-
24AE.
Step 2
Thread the two replacement screws through the MPM-2
bracket and through the two standoffs provided. Place
the MPM-2 assembly over the MPS-24A or MPS-24AE
and secure with the two screws.
Step 3
Complete the installation of the MPM-2 by
plugging the female connector on the meter
into Plug P7 on the MPS-24A or MPS-24AE.
Figure 3.4-1 Installation of the Main Power Meter
Section 3.4 The Optional Main Power Meter
The optional Main Power Meter (MPM-2) may only be installed on the Main Power Supply, MPS-24A or MPS-24AE
(refer to Figure 3.4-1).