4457SD5 Manual
C53000-G1176-C169-1
Mounting and Commissioning 3
This chapter is intended for experienced commissioning staff. The staff must be famil-
iar with the commissioning of protection and control systems, with the management of
power systems and with the relevant safety rules and guidelines. Under certain cir-
cumstances particular power system adaptations of the hardware are necessary.
Some of the primary tests require the protected line or equipment to carry load.
3.1 Mounting and Connections 446
3.2 Checking Connections 471
3.3 Commissioning 477
3.4 Final Preparation of the Device 516