Low Voltage Products & Systems 39
ABB Inc. • 888-385-1221 • www.abb-control.com AC 1006.9 - 5/03
Chapter 5 - Connection
This chapter describes the electrical connections as well as connections for
communication devices (optional) that must be made before the softstarter can
be operated.
5:1 General
Caution!
All wiring and connection must be carried out by a qualified electrician,
and in accordance with installation standards and safety regulations.
See Chapter 2 “ Quickstart”.