Publication 2711-UM014B-EN-P
Installing the PV300 Terminal 7-5
Installing the PV300 in a
Panel
To install the PV300 terminal in a panel:
1. Cut an opening in the panel using the panel cutout provided
with the terminal. Remove any sharp edges or burrs.
2. Make sure the terminal sealing gasket is properly positioned on
the terminal as shown below. This gasket forms a compression
type seal. Do not use sealing compounds.
3. Verify that the end of the legend strip is fully inserted and does
not interfere with the sealing gasket.
4. Place the terminal in the panel cutout.
5. Verify that the opening is the proper size to clear the bezel and
to allow the gasket to contact the panel.
ATTENTION
!
• Disconnect all electrical power from the panel
before making the cutout.
• Make sure the area around the panel cutout is
clear.
• Do not allow metal cuttings to enter any
components that may already be installed in the
panel.
• Failure to follow this warning may result in
personal injury or damage to the panel
components.
Sealing Gasket
Legend Strip