Procedure
Step 1 Log in to the ECC800-Pro WebUI as user admin. Choose Monitoring > Cooling >
FusionCol5000-A0031. The page for commissioning smart cooling products is
displayed.
If no manual operation is performed within 25 seconds after you click On, the equipment
will automatically run according to the preset logic, and the compressor and indoor and
outdoor fans will also run according to environment requirements.
Step 2 Choose Controls > Control Information, set Power on/o to ON, and click
Submit.
----End
Exception Handling
Step 1 Check that the T/H control mode and T/H set point are properly set.
Step 2 Check that the current time is correctly set.
Step 3 Check that the return air
lter is installed in the correct direction.
----End
5.3 Management System Power-On Commissioning
5.3.1 Preparations and WebUI Login
Prerequisites
● Supported operating system: Windows 7 and later versions
● It is recommended that the screen resolution be 1366 x 768 or higher.
● Browser: Chrome, Firefox 32, Internet Explorer 11 or later
Procedure
Step 1 Connect a network cable between the PC network port and the WAN1 port
(protected by a security mechanism) on the ECC800-Pro.
Table 5-3 Default IP addresses for the WAN and LAN ports on the ECC800-Pro
Port
Default IP Address
WAN1 192.168.8.10
WAN2 192.168.0.10
192.168.248.10 (FusionModule800)
LAN1 and LAN2 192.168.248.10
FusionModule500 Smart Mini Data Center
User Manual (Philippines, FusionModule500-
SU61A12S) 5 Power-On Commissioning
Issue 02 (2021-06-30) Copyright © Huawei Technologies Co., Ltd. 109