Table 4-4 Components in the cabinet scenario
No. Component
(1) ECC800-Pro
(2) PDU5000
(3) UPS
(4) Electronic clasp lock
(5) Lithium battery
(6) 3.5 kW integrated air conditioner
(7) Water sensor
(8) Smoke detector
(9) T/H sensor
(10) rPDU
If devices such as the VCN, server, and LAN switch are congured, determine their
installation positions based on the site requirements.
4.1.5 Personnel Requirements
Only trained and qualied personnel who fully understand basic safety
precautions are allowed to install and operate a modular data center.
Huawei will not be liable for any consequence caused by the violation of this
document.
The requirements are as follows:
● Customers' installation personnel must be trained by Huawei and understand
how to install and operate a modular data center.
● The number of installation personnel varies based on the project progress and
installation environment. Typically, two to three persons are required.
4.2 Hardware Installation
The angle of door opening by the gas spring is 110°. Ensure that the door opening
angle is less than 110°.
FusionModule500 Smart Mini Data Center
User Manual (Philippines, FusionModule500-
SU61A12S) 4 Installation Guide
Issue 02 (2021-06-30) Copyright © Huawei Technologies Co., Ltd. 59