Procedure
Step 1 Check that the power cables and ground cables of the upstream components of
the server are securely connected with correct polarity and in good contact.
Step 2 Ensure that the upstream input power supply is not connected. Use a multimeter
to measure the resistance between the upstream output power supplies and
between the working ground and the protection ground. It is required that short
circuit not occur between power outputs or between the BGND and PGND.
Step 3 Turn on the switch for the upstream power supply of the server.
Step 4 Press the power button on the chassis of the server to power on the server.
After the server is started properly, the button/indicator of its power switch is displayed
green.
Figure 5-17 Power button on the 2288X V5 server
Figure 5-18 TaiShan 200 server power button
----End
5.3.11.1.4 Logging In to the NetEco Client
This section describes how to log in to the NetEco client using a web browser.
Prerequisites
● The network connection between your PC and the client IP address of the
NetEco is normal and the function of the O&M plane are running properly.
● You have obtained the user name and password for login.
FusionModule500 Smart Mini Data Center
User Manual (Philippines, FusionModule500-
SU61A12S) 5 Power-On Commissioning
Issue 02 (2021-06-30) Copyright © Huawei Technologies Co., Ltd. 141