Figure 4-12 Drainpipe routed from the bottom
● After routing the water pipe, secure it to the pipe assembly using cable ties,
and seal the cable hole using
restop putty.
● After connecting the drainpipe, check whether the drainage is normal.
Step 4 Install the bae plate for the smart cooling product.
----End
Follow-up Procedure
Before removing the smart cooling product, remove the upper bae plate and the
side panels on both sides of the cabinet.
4.2.5 Installing Power Supply and Distribution Devices
4.2.5.1 Installing Lithium Batteries
Context
Install lithium batteries in the 11th U and higher positions of the cabinet.
Procedure
Step 1 Push a lithium battery into the cabinet and secure it.
FusionModule500 Smart Mini Data Center
User Manual (Philippines, FusionModule500-
SU61A12S) 4 Installation Guide