EasyManuals Logo
Home>IBM>UPS>2145UPS-1U

IBM 2145UPS-1U User Manual

IBM 2145UPS-1U
233 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #83 background imageLoading...
Page #83 background image
3. If you have not already connected the internal battery connector, remove the
2145 UPS-1U front panel.
4. Remove the protective label from the internal battery connector.
5. Connect the internal battery connector. Each end of the keyed connector has
two wires: one red (+) and one black (−). Join the black wires and the red wires
together.
Note: A small amount of arcing might occur when connecting the batteries.
This is normal and does not damage the unit or present any safety
concerns.
svc00063
Figure 19. Removing the 2145 UPS-1U front panel
svc00062
Figure 20. The 2145 UPS-1U internal battery connector with protective tape
Chapter 6. Installing the SAN Volume Controller 2145-8G4 hardware 45
|
|

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM 2145UPS-1U and is the answer not in the manual?

IBM 2145UPS-1U Specifications

General IconGeneral
BrandIBM
Model2145UPS-1U
CategoryUPS
LanguageEnglish

Related product manuals