MAINTENANCE
SYNCHRONIZATION AND LINKAGE ADJUSTMENTS - 9.9/15
SYNCHRONIZATION
AND LINKAGE
ADJUSTMENTS
- 9.9/15
IMPORTANT: Synchronization and linkage pro-
cedures MUST
be
followed
in
sequence and
be
performed exactly
as
described to ensure consis-
tent engine
idling
and
smooth operation through-
out the
RPM
range.
IMPORTANT:
If
equipped, remove both remote
control cables from the outboard before perform-
ing these adjustments.
Preliminary Adjustments
TILLER MODELS
Turn the idle adjustment knob counterclockwise to
the full SLOW position.
Turn the connector
clockwise until
it
seats. Turn
counterclockwise no more than
one-half turn to
align
it
with the throttle lever. Install the retaining
pin.
34782
The throttle cable bracket must
be
flush with the
inside edge of the threaded
cable.
To
adjust,
remove the screw and turn bracket.
Install screw.
2
1. Throttle cable bracket
34784
2. Screw
Remove the pin retaining the cable connector to Close the throttle completely so the idle speed
the
throttle lever. screw
is
against the stop. The center of the cam
follower roller should
be
halfway between pick-up
mark and the
end
of the throttle cam.
E
o
U
Qj
)(
~
Qj
~
70
~
I