Table 34: SRX110 Services Gateway Preinstallation Checklist for
Desk-Mount Installation (continued)
Additional InformationTask
“Unpacking the SRX110 Services Gateway”
on page 81
Remove the services gateway chassis from the
shipping carton.
Verify that you have the following parts available in
your desk-mounting kit to mount the SRX110 Services
Gateway vertically:
•
Vertical stand
•
Screws
NOTE: If you are mounting the services gateway horizontally on a desk, ensure
that the rubber feet are attached to the chassis.
NOTE: The vertical desk-mounting kit is not shipped with the device and
must be ordered separately.
Related
Documentation
Site Preparation Checklist for the SRX110 Services Gateway on page 35•
• Unpacking the SRX110 Services Gateway on page 81
• Clearance Requirements for Airflow and Hardware Maintenance of the SRX110 Services
Gateway on page 40
• Preparing the SRX110 Services Gateway for Rack-Mount Installation on page 85
• Preparing the SRX110 Services Gateway for Wall-Mount Installation on page 87
Preparing the SRX110 Services Gateway for Wall-Mount Installation
You can mount an SRX110 Services Gateway on a wall. The four rubber feet attached to
the chassis provide stability.
Table 35 on page 87 provides the list of tasks you need to perform before installing the
device.
Table 35: SRX110 Services Gateway Preinstallation Checklist for
Wall-Mount Installation
Additional InformationTask
“Site Preparation Checklist for the
SRX110 Services Gateway” on page 35
Verify that the site meets the requirements.
“Unpacking the SRX110 Services
Gateway” on page 81
Remove the services gateway chassis from the
shipping carton.
87Copyright © 2012, Juniper Networks, Inc.
Chapter 12: Installing the Mounting Hardware