General Site Guidelines for Installing the SRX110 Services Gateway
The following precautions help you plan an acceptable operating environment for your
services gateway and avoid environmentally caused equipment failures:
•
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Allow sufficient clearance between the front and back of the chassis and
adjacent equipment. Ensure that there is adequate circulation in the installation location.
•
Follow the electrostatic discharge (ESD) procedures to avoid damaging the equipment.
Static discharge can cause components to fail completely or intermittently over time.
NOTE: Install the deviceonlyin restricted areas, such asdedicated equipment
rooms and equipment closets, in accordance with Articles 110–16, 110–17,
and 110–18 of the National Electrical Code, ANSI/NFPA 70.
Related
Documentation
SRX110 Services Gateway Specifications on page 7•
• SRX110 Services Gateway General Safety Guidelines and Warnings on page 45
• Site Preparation Checklist for the SRX110 Services Gateway on page 35
• SRX110 Services Gateway Rack Requirements on page 39
• SRX110 Services Gateway Cabinet Requirements on page 38
• Clearance Requirements for Airflow and Hardware Maintenance of the SRX110 Services
Gateway on page 40
SRX110 Services Gateway Cabinet Requirements
The services gateway can be installed in a standard 31.5-in. (80.0-cm) or larger enclosed
cabinet.
Table 18 on page 38 provides the details on cabinet size, clearance, and airflow
requirements.
Table 18: SRX110 Services Gateway Cabinet Requirements
SpecificationsCabinet Requirement
19 in. (48.3 cm) as defined in Cabinets, Racks, Panels, and
Associated Equipment (document number EIA-310–D)
published by the Electronics Industry Association
(http://www.eia.org).
You can mount the services gateway horizontally in the
cabinet.
Size
Copyright © 2012, Juniper Networks, Inc.38
SRX110 Services Gateway Hardware