7.4
FINAL DRIVE
9924125 - 2013 RANGER RZR / RZR S / RZR 4 Service Manual
© Copyright 2012 Polaris Sales Inc.
Bearing Installation
5. Thoroughly clean the front bearing carrier housing
a
nd the outer race on the new bearing. Be sure that
all oil residue has been removed from each surface.
6. Support the bottom of the bearing carrier housing.
7. Apply Loc
tite® 603™
retaining compound to outer
circumference of new bearing race and carefully
press new bearing into the bearing carrier housing.
NOTE: Use care to not allow any of the Loctite®
compound to get in the bearing.
8. Wipe the housing clean of any excess compound and
ins
tall the snap ring.
Bearing Carrier Installation
1. Install drive shaft axle through the backside of the
bearing carrier.
2. Install the upper and lower ball joint ends into the front
b
earing carrier.
3. Install pinch bolts and torque to specification.
4. Apply grease to drive shaft axle splines.
5. Install front wheel hub assembly, cone washers, and
han
d tighten the castle nut. Install washers with
domed side out.
Use an arbor and press only on the outer race,
otherwise bearing damage may occur.
Apply
Loctite® 603™
Bearing
Snap Ring
RZR / RZR S
Shown
Ball Joint Pinch Bolts:
23 ft-lbs (31 Nm)
23 ft-lbs
(31 Nm)
RZR / RZR S
Shown
RZR 4
Shown
23 ft-lbs
(31 Nm)