7.10
FINAL DRIVE
9924125 - 2013 RANGER RZR / RZR S / RZR 4 Service Manual
© Copyright 2012 Polaris Sales Inc.
Drive Shaft Installation
1. Install new spring ring on drive shaft. Apply an anti-
seize compound to splines.
2. Align splines of drive shaft with front gearcase and
r
einstall the drive shaft. Use a rubber mallet to tap on
the outboard end of the drive shaft if necessary
3. Install drive shaft into the front bearing carrier.
4. Install the upper ball joint end into the front bearing
carrier.
5. Install the upper pinch bolt and torque to specification.
6. Apply grease to drive shaft axle splines.
7. Install front wheel hub assembly, cone washers, and
han
d tighten the castle nut. Install washers with
domed side out.
Apply
Anti-Seize
NEW
Spring Ring
Ball Joint Pinch Bolts:
23 ft-lbs (31 Nm)
23 ft-lbs
(31 Nm)
RZR / RZR S
Shown
RZR 4
Shown
23 ft-lbs
(31 Nm)