31. CONNECT CABLES, HOSES, CONNECTORS, STRAP
AND WIRES
(a) Connect the following cables:
• Accelerator cable
• (A/T only)
Throttle cable
• (w/ Cruise Control System)
Cruise control cable
(b) Connect the following hoses:
• PS air hoses to gas filter and air pipe
• Brake booster hose
(w/ Cruise Control System)
• Cruise control vacuum hose
• Charcoal canister hose from canister
• VSV vacuum hoses
(c) Connect the following strap, wires and connectors:
• Ground strap to LH fender apron
• Generator connector and wire
• Igniter connector
• Oil pressure sender gauge connector
• Ground strap to engine rear side
• ECM connectors
• VSV connectors
• A/C compressor connector
• (M/T only)
Starter relay connector
• Solenoid resister connector
• Data link connector 1
(w/ ADD)
ADD switch connector
32. INSTALL GENERATOR DRIVE BELT
33. INSTALL COOLING FAN
Install the cooling fan with the four nuts.
Torque: 5.4 N–m (55 kgf–cm, 48 in.–Ibf)
34. INSTALL A/C DRIVE BELT
35. INSTALL PS PUMP
36. INSTALL PS PUMP PULLEY AND DRIVE BELT
–ENGINE ENGINE MECHANICAL
EG2–88