EasyManuals Logo
Home>Wacker Neuson>Portable Generator>G 25

Wacker Neuson G 25 User Manual

Wacker Neuson G 25
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #153 background imageLoading...
Page #153 background image
wc_tx003614gb_FM10.fm
153
Mobile Generator
General Maintenance
16 General Maintenance
16.1 Periodic Maintenance Schedule
The table below lists basic machine maintenance. Tasks designated with check
marks may be performed by the operator. Tasks designated with square bullet
points require special training and equipment.
16.2 Maintaining the Emission Control System
For machines sold in North America:
Normal maintenance, replacement, or repair of emission control devices and
systems may be performed by any repair establishment or individual; however,
warranty repairs must be performed by a dealer/service center authorized by
Wacker Neuson. The use of service parts that are not equivalent in performance
and durability to authorized parts may impair the effectiveness of the emission
control system and may have a bearing on the outcome of a warranty claim.
WARNING
A poorly maintained machine can malfunction, causing injuries or permanent
damage to the machine.
Keep the machine in safe operating condition by performing periodic mainte-
nance and making repairs as needed.
Daily
50
hours
or 2
weeks
250
hours
600
hours
or 12
months
Other
Conduct visual walk-around inspection.
Check exhaust system.
Drain containment system.
Service the battery.
Clean the machine inside and out.
Grease axle.
Check brake fluid level in trailer at least monthly.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson G 25 and is the answer not in the manual?

Wacker Neuson G 25 Specifications

General IconGeneral
BrandWacker Neuson
ModelG 25
CategoryPortable Generator
LanguageEnglish

Related product manuals