EasyManuals Logo
Home>Wacker Neuson>Portable Generator>G 25

Wacker Neuson G 25 User Manual

Wacker Neuson G 25
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
wc_tx003570gb_FM10.fm
41
Mobile Generator
Lifting and Transporting
4.6 Testing the Breakaway System (Hydraulic Surge Brakes)
Requirements
Hydraulic reservoir filled
Machine parked on a flat surface
When
Test the breakaway system:
Before towing
After filling the hydraulic reservoir
Procedure
Perform the following procedure to test the breakaway system.
1. Position the machine/trailer on a flat surface.
2. Connect the breakaway cable (a) to the tow vehicle. Do not connect the
machine/trailer to the tow vehicle via the hitch.
3. Slowly move the tow vehicle so that it pulls on the breakaway cord until the
emergency lever reaches its second notch (b) and locks into the ON position.
4. Connect the machine/trailer to the tow vehicle via the hitch.
5. Attempt to tow the machine/trailer at a very slow speed (less than 5 mph). When
activated, a properly working breakaway system will cause substantial drag on
the trailer wheels and may even cause the trailer wheels to lock.
6. If the brakes did not function, repair any faults before towing.
This procedure continues on the next page.
wc_gr008509
a
wc_gr008508
b
WARNING
Personal injury hazard. A faulty breakaway system may lead to an accident and
personal injury if the machine/trailer breaks away.
Do not tow the machine/trailer if the breakaway system is faulty.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson G 25 and is the answer not in the manual?

Wacker Neuson G 25 Specifications

General IconGeneral
BrandWacker Neuson
ModelG 25
CategoryPortable Generator
LanguageEnglish

Related product manuals