Figure 3-2 Power Control page
3 Click Power On. In the displayed dialog box, click OK to power on the compute node.
----End
Verification
Check the indicator status after the compute node is powered on.
3.3 Removing the G560
Step 1 Power off the G560. For details, see 3.1 Powering Off the Compute Node.
Step 2 Determine the position of the node. See Figure 3-3. The G560 is in the lower slot and the
GP608 is in the upper slot.
Figure 3-3 Node slots
FusionServer G5500 Server
User Guide
3 Basic Operations
Issue 02 (2017-12-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
36