EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK6300L-1

Manitowoc Grove GMK6300L-1 Maintenance Manual

Manitowoc Grove GMK6300L-1
370 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #102 background imageLoading...
Page #102 background image
Maintenance work on the carrier
7.4 Fuel system
7 - 26 3 302 719 en Maintenance manual
GMK6300L-1
13.02.2018
7.4.1 Draining off water from fuel filter 1
Spare parts and
tools
– Receptacle, approx. 5 ltr (1.5 gal); à p. 2 - 4.
Prerequisites – The truck crane must be standing level and on outriggers;
à Manual de instrucciones.
– The main boom must be fully raised;
à Manual de instrucciones.
– The engine must be switched off and secured against unauthorised
use
;
à p. 2 - 3.
Draining off water
• Place a receptacle underneath the filter.
• Open the valve (1).
• If the consumable that emerges is clean,
close the valve by hand.
• Remove the receptacle and properly
dispose of the drained consumable.
D
O
Risk of environmental damage due to leaking consumables.
Always let consumables drain into suitable receptacles. Wipe up
any c
onsumables that escape.
Store/dispose of consumables and any soaked equipment properly.
Ask about the applicable regulations.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L-1 and is the answer not in the manual?

Manitowoc Grove GMK6300L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals