Maintenance work on the superstructure
8.15 Electrical system
8 - 112 3 302 719 en Maintenance manual
GMK6300L-1
13.02.2018
8.15.2 Checking the batteries
• Switch the battery master switch (1) off and
remove the selector handle.
• Remove the cap (3) from the battery box.
• Check the batteries (2) in the same way as
when checking them on the carrier;
à Checking the batteries, p. 7 - 104.
• Screw the cap on the battery box again.
8.15.3 Checking the charge level of the batteries
• Check the charge level in the same way as when checking it on the carrier;
à Checking the charge level of the batteries, p. 7 - 106.
M 1
M 3

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L-1 and is the answer not in the manual?

Manitowoc Grove GMK6300L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals