Maintenance work on the superstructure
8.6 Hoists
8 - 46 3 302 719 en Maintenance manual
GMK6300L-1
13.02.2018
8.6.6 Having a partial inspection carried out
Only suitably trained specialists should carry out a partial inspection of
– the multiple-disc brake,
– the plug connections between the hydraulic motor and the multiple-disk
br
ake,
– the plug connections between the multiple-disk brake and transmission
uni
t
and be permitted to exchange parts with signs of wear.
8.6.7 Having a general inspection carried out
H
When carrying out the general inspection of the hoists, also observe the
information contained in
Measures required for winch monitoring, p. 5 - 21.
The general inspection involves removing the transmission and sending
it to th
e manufacturer to be examined.
H
For transmissions that have undergone a general overhaul, an oil change
must be carried out after 200 and 1000 operating hours;
à Running-in
regulations
, p. 4 - 1.