EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK6300L-1

Manitowoc Grove GMK6300L-1 Maintenance Manual

Manitowoc Grove GMK6300L-1
370 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #313 background imageLoading...
Page #313 background image
Maintenance work on the superstructure
8.12 Cable drums and slewing angle sensor
13.02.2018
Maintenance manual 3 302 719 en 8 - 103
GMK6300L-1
8.12 Cable drums and slewing angle sensor
8.12.1 Maintenance of the slip ring assemblies
The slip ring assemblies are located in:
Spare parts and
tools
– Clean, lint-free cloth.
– Dry, oil-free compressed air.
Prerequisites
For cable drum 1
– The main boom must be set down on the support; à Manual de
instrucciones
.
For cable drum 2
– The main boom must be fully raised; à Manual de instrucciones.
– The cover plate in front of the cable drum 2 is removed.
For cable drums 1 and 2
– The engine must be switched off and secured against unauthorised use;
à p. 2 - 3.
– The selector handle must be removed from the battery master switch.
s
1 Cable drum 1
2 Cable drum 2
M 6
Designation Quantity GROVE part no.
Cover gasket for cable drum 1 1 03325575
Cover gasket for cable drum 2 1 03137971

Table of Contents

Other manuals for Manitowoc Grove GMK6300L-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L-1 and is the answer not in the manual?

Manitowoc Grove GMK6300L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals