EasyManua.ls Logo

Wintriss wpc 2000 - Figure 2-8. Pre-Wired Operator Station with Side Run Buttons: Mounting Dimensions; Figure 2-9. Pre-Wired Operator Station with Top Run Buttons: Mounting Dimensions; Making Wiring Connections

Wintriss wpc 2000
250 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WPC 2000 User Manual 1128500
Installation 2-15
Making Wiring Connections
To wire a pre-wired Operator Station, perform the following steps:
1. Punch a hole in the Operator Station enclosure for conduit or sealtight.
2. Connect the conduit or sealtight to the hole; then open the Operator Station box.
Figure 2-8. Pre-wired Operator Station with Side Run Buttons: Mounting Dimensions
Figure 2-9. Pre-wired Operator Station with Top Run Buttons: Mounting Dimensions
MUTE
PALM
TIME
PRIOR
ACT
INTRISS
W
TOP
STOP
5.8
(148)
REF
4.69
(119.1)
16.75
(425.5)
R
U
N
/
I
N
C
H
R
U
N
/
I
N
C
H
5.50
(139.7)
21.25
(539.8)
Dimensions:
inches
(mm)
E
M
E
R
G
E
N
C
Y
S
T
O
P
6.06
(154.0)
MUTE
PALM
TIME
PRIOR
ACT
INTRISS
W
TOP
STOP
16.75
(425.5)
28.75
(730.3)
5.50
(139.7)
4.69
(119.1)
E
M
E
R
G
E
N
C
Y
S
T
O
P
Dimensions:
inches
(mm)

Table of Contents

Related product manuals