Chapter 5: Setup / service program
5-68 Fresenius Medical Care 4008 S (Version V10) SM-EN 7/01.13
5.2.4 P.C.B. LP 632 (CPU 2) DIP switch array 1
Warning
DIP switch 3 (array 1) allows skipping test runs that are requested by
the device. If the switch is set such that a test run can be skipped, then
it must be noted that the operator has the possibility of evading the
automatic test of the safety systems. The person requesting such a
setting is responsible for this procedure.
DIP switch /
Position
Function
1
ON
OFF not assigned
2
ON
OFF
T1 Test
Serial sequence
Parallel sequence
3
ON
OFF
T1 Test
Skip
Mandatory
4
ON
OFF
Test Service
ON (single test steps can be selected; dialysis mode not possible)
OFF (automatic T1 test)
5
ON
OFF
Cyclic PHT
Every 2 minutes and events display (Service)
Every 12.5 minutes, alarm output only with cyclic PHT alarm
6
ON
OFF
Cyclic PHT
ON
OFF
7
ON
OFF
Air Detector
Not permitted
with P.C.B. LP 450-2
8
ON
OFF not assigned
The basic position on delivery is in italics.
"No assignment" requires the OFF position.