Chapter 11: Functional description
11-42 Fresenius Medical Care 4008 S (Version V10) SM-EN 7/01.13
PGM 4: –F–HDIS–M–HR–
PGM 5: –F–D(F)–M–
80
37
T/°C
t/min
Rinse chamber
evacuation
10 strokes each
Start End
approx. 1 minapprox. 6 min
3–10 min
(Setup)
approx.
4 min
approx.
1 min
Heating
Rinsing clean
approx. 6 min
15–30 min
(Setup)
approx.
4 min
Heating
Mandatory RinsePrep.*
Hot rinsing
Hot
disinfection
15–30 min (Setup)10–20 min
(Setup)
Prep.*: preparation phase:
Heater off.
Set the level of the float switch chamber below the lower switching point of the float switch
by 1 balancing chamber changeover and 4 UF pump strokes.
Aspiration of disinfectant for 50 UF-pump strokes.
33
37
T/°C
t/min
Mandatory RinseDisinfection
15–30 min (Setup)10–20 min (Setup)
Start End
approx. 1 min
Rinse chamber
evacuation
10 strokes each
Rinsing clean
3–10 min
(Setup)
Prep.*
approx.
1 min
Prep.*: preparation phase:
Heater off.
Set the level of the float switch chamber below the lower switching point of the float switch by 23 UF pump strokes.
Aspiration of disinfectant for 32 concentrate pump strokes à 330 steps.