Moving and transporting the system
Vivid S70 / S60 – User Manual 3-53
BC092760-1EN 01
Reinstalling at a new location
1. When the system is in place at a new location, lock the
wheel brakes.
2. Follow the installation procedure described in ‘Connecting
the system’ on page 3-4.
Acclimation time
Following transport, allow the system to acclimate before
switching it on. Acclimation will take one hour for each 2.5
o
C
increment when the system’s temperature is below 10
o
C or
above 35
o
C.
Preparing Vivid S70 / S60 for scanning
1. Lock front Wheel brakes
2. Un-Wrap the AC power cord and plug into power source.
3. Lift the main display to the fully open position. Secure the
Monitor at full upright position.
4. Turn the system on.
5. Connect external cables if needed (LAN, USB, etc.).
6. Probe being used to scan should be ready, with cables clear
of foot area and wheels by wrapping un-used portion of the
cord on respective hooks provided.
7. Adjust keyboard's height and swivel (‘Main display
adjustment’ on page 3-44).
NOTE: Ensure that the probe cables do not protrude from the system or
interfere with the wheels, or foot area. The Hanging cords may
cause damage to system if lodged or hooked onto nearby items.
By ensuring cords are secure and out of lower portion of the
system, this may provide a more secure atmosphere and avoid
unnecessary damage.
o
C
-20-15-10-5 0 5 10354045505560
o
F
-4 5 14 23 32 41 50 95 104 113 122 131 140
Hours 1210864200246810