5. ENGINE REMOVAL/INSTALLATION
5-13
DINK 125
ENGINE HANGER BRACKET
INSPECTION
Inspect the stopper rubbers and bushings for
damage and replace with new ones if
necessary.
ENGINE INSTALLATION
Install the engine in the reverse order of
removal.
Torque Values:
Engine mounting bolt : 4.5~5.5kg-m
Rear shock absorber lower mount bolt:
2.4~3.0kg-m
Perform the following inspections and
adjustments after installation.
• Rear brake cable
Cables and wires should be routed
properly.
*
Bushings Bushings