EasyManuals Logo
Home>Daewoo>Automobile>NUBIRA

Daewoo NUBIRA User Manual

Daewoo NUBIRA
744 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #438 background imageLoading...
Page #438 background image
HEATING AND VENTILATION SYSTEM 7A 17
DAEWOO V121 BL4
Installation Procedure
1. Install the temperature control cable eyelet to the
post on the controller.
2. Snap the cable housing connector to the slide posi-
tion on the controller.
3. Gently insert the controller into position on the cen-
ter console.
4. Install the four controller retaining screws.
Tighten
Tighten the HVAC controller retaining screws to 2
NSm (18 lbin).
5. Install the temperature control cable eyelet to the
post on the temperature door lever.
6. Snap the cable retainer to the blower housing.
7. Move the temperature control to verify the smooth
operation and function of the door and the cable.
8. Install the audio system trim plate. Refer to Section
9F, Audio Systems.
9. Connect the negative battery cable.
10. Operate the heating and cooling systems to verify
proper function.
11. Install the glove box. Refer to Section 9E, Instru-
mentation/Driver Information.

Table of Contents

Other manuals for Daewoo NUBIRA

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daewoo NUBIRA and is the answer not in the manual?

Daewoo NUBIRA Specifications

General IconGeneral
BrandDaewoo
ModelNUBIRA
CategoryAutomobile
LanguageEnglish

Related product manuals