Interpreting POST and boot results
175
Diagnostics and Troubleshooting
Boot
In addition to POST, boot includes the following steps after POST is
complete:
1. Universal port configuration is performed.
2. Links are initialized.
3. Fabric is analyzed. If any ports are connected to other switches,
the ED-DCX-4S-B participates in a fabric configuration.
4. The ED-DCX-4S-B obtains a domain ID and assigns port
addresses.
5. Unicast routing tables are constructed.
6. Normal port operation is enabled.