EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK6300L

Manitowoc Grove GMK6300L User Manual

Manitowoc Grove GMK6300L
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #292 background imageLoading...
Page #292 background image
Driving modes
6.4 Main boom, removing/installing
6 - 20 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
6.4.1 CHECKLIST: Removing the main boom
H
This checklist is not a complete operating manual. There are accompanying
instructions, which are indicated by cross-references.
Observe the warnings and safety instructions specified there!
Prerequisites – The auxiliary hoist has been unrigged.
– The hose drum is removed.
– The counterweight is unrigged.
– All lattice extensions have been removed.
– All telescopic sections are fully retracted and locked.
– The hook block has been unreeved and the hoist rope has been reeled on
the drum up to the main hoist.
– The superstructure is slewed to the front.
– The truck crane is supported by an outrigger span of at least 8,70 x 2,71 m
(28.5 x 8.9 ft).
Checklist
1. Raise main boom and
– disconnect the hydraulic/electrical connections;
à p. 6 - 36,
– remove the clamps for the hoses;
à p. 6 - 28.
2. Place the derricking cylinder support on the counterweight platform;
à p. 6 - 30.
3. Place the main boom on the boom rest.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals