Driving modes
6.4 Main boom, removing/installing
6 - 40 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
6.4.10 Aligning the connecting points
Aligning the connecting points
• Lay the hoses into the turntable in such as
way that they are not damaged during
alignment.
• Align the main boom so that the boom pivot
pin is aligned with the bearing points (1) in
the turntable.
• Hold the main boom in this position until the
pivot pin is pushed in.
6.4.11 Securing/releasing the derricking cylinder
(A) – Securing
• Place the tightening belt (1) over the
derricking cylinder and fasten it onto the
holders (2).
• Tighten the tightening belt so that the der-
ricking cylinder is secure within the support.
(B) – Releasing
• Loosen the tightening belt (1) and remove it
from the holders (2).
• Stow the tightening belt away.
S
Risk of damage to the turntable and the connection lines!
Make sure that the connection lines are located within the turntable and
that the main boom does not swing when you raise it for insertion into the
turntable.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals