Driving modes
6.7 Rigging the auxiliary hoist
Operating Manual GMK6300L 3 112 xxx en 6 - 91
xx.xx.xxxx
6.7.2 CHECKLIST: Auxiliary hoist, removing
Prerequisites – The truck crane is supported with the required outrigger span as specified
in the
Lifting capacity table; à p. 12 - 30.
– The hoist rope on the auxiliary hoist must be unreeved and wound up.
– The superstructure is slewed to the rear.
– The 54.5 t counterweight combination is resting on the counterweight
platform;
à p. 12 - 62,
or
– Install the rigging frame for counterweight combinations of up to a maxi-
mum of 26 t (57,320 lbs).
1. – Secure the hoist rope;
à p. 6 - 101.
2. Connect the hand-held control at the right rear of the turntable;
à Connecting/disconnecting the hand-held control, p. 12 - 21.
3. Removing the connection to the turntable:
– Lower the lifting frame;
à p. 6 - 100.
– Remove the connection to the turntable;
à p. 6 - 98.
– Lower the auxiliary hoist;
à p. 6 - 100.
4. If necessary, disconnect and stow the hand-held control;
à Connecting/disconnecting the hand-held control, p. 12 - 21.
s

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals