Malfunctions during crane operation
14.6 Hydraulic emergency operation
14 - 76 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
14.6.7 Emergency supply of another crane
For emergency
supply
The hoses are assigned according to the various diameters.
On the crane to be supplied
• Attach the transformer (3).
• Connect the hoses (4); à Operating manual
of the other crane
.
On the GMK6300L
• Switch off the engine for driving.
• Connect the hoses (2) to the connections (1).
• Switch on the hydraulic emergency opera-
tion;
à p. 14 - 68.
After emergency
supply
• Switch off the hydraulic emergency operation; à p. 14 - 68.
On the GMK6300L
• Remove the hoses (2) from the connec-
tions (1).
On the crane that was supplied
• Disconnect the hoses (4).
• Close all the hoses and connections with
the caps.
• Remove the transformer (3).