Rigging work
12.7 Rigging/unrigging the counterweight
12 - 60 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
12.7.5 CHECKLIST: Unrigging the counterweight
H
This checklist is not a complete operating manual. There are accompanying
instructions, which are indicated by cross-references.
Observe the warnings and safety instructions there!
1. The truck crane is stabilised with the outrigger span required for crane
work according to the
Lifting capacity chart; Ã Permissible outrigger
spans
, p. 12 - 30.
2. If required, remove the auxiliary hoist;
à CHECKLIST: Auxiliary hoist,
removing
, p. 6 - 91.
3. Enter the current rigging mode on the RCL;
à p. 11 - 23.
4. Slew the superstructure into the
0° to the rear position;
à Slewing with rigged counterweight, p. 12 - 83.
G
Danger of overturning when slewing with a rigged counterweight!
Before slewing with the rigged counterweight, check whether slewing is
permissible with the rigged outrigger span or with the truck crane free on
wheels;
à Slewing with rigged counterweight, p. 12 - 83.