Rigging work
12.1 Rigging work checklists for crane operation with the main boom
Operating Manual GMK6300L 3 112 xxx en 12 - 1
xx.xx.xxxx
12 Rigging work
If the truck crane on the site has already been rigged, proceed according to
the
CHECKLIST: Checks before operating the crane, p. 11 - 1.
12.1 Rigging work checklists for crane operation with the
main boom
H
This checklist is not a complete operating manual. There are accompanying
instructions, which are indicated by cross-references.
Observe the warnings and safety instructions there!
12.1.1 CHECKLIST: Rigging
1. Choose a suitable site; Ã Choice of a suitable positioning site, p. 12 - 9.
2. Check that the parking brake is applied – if necessary, apply the parking
brake.
3. If the main boom is resting on a trailer:
– Switch off the boom floating position;
à p. 12 - 17,
– Switch off the slewing gear freewheel;
à p. 12 - 18,
– If necessary, switch off boom pre-tensioning;
à p. 12 - 19.