EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK6300L

Manitowoc Grove GMK6300L User Manual

Manitowoc Grove GMK6300L
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #650 background imageLoading...
Page #650 background image
Crane operation
11.2 Operation of the rated capacity limiter
11 - 38 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
– All crane movements which increase the
load moment will be switched off.
– A continuous buzzer tone will sound.
After five seconds, you can switch off the
buzzer tone using button (4).
– Lamps (5) and (6) light up.
– Display (3) shows the current degree of utili-
sation, e.g. 100%; the bar is red.
– The value on display (2) is equal to or
greater than the value on display (1).
Cancelling a shutdown
• Turn off the buzzer tone if necessary.
• Leave the shutdown range by moving the crane according to the
following table.
H
If you have left the shutdown range, lamp (1) will extinguish.
After pressing the button (2) the crane movements will be enabled.
Switched off crane movements Permitted crane movements
Lift loads Lower loads
Lower the main boom Raising the main boom
1)
Extend the main boom Retracting the main boom
1)
Slew to the left Slew to the right
Slew to the right Slew to the left
Lower the lattice extension Raise the lattice extension
1)
In some cases, the RCL will also switch off these movements. In this case,
leave the shutdown range through other enabled movements. If this is
not possible, set down the load.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals