EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK6300L

Manitowoc Grove GMK6300L User Manual

Manitowoc Grove GMK6300L
1004 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #679 background imageLoading...
Page #679 background image
Crane operation
11.3 Crane operation with main boom
Operating Manual GMK6300L 3 112 xxx en 11 - 67
xx.xx.xxxx
Overview This illustration shows the completely retracted main boom with the basic
section (9) and the first three telescopic sections
I to III (1) to (3).
Each telescopic section is equipped with two locking pins (7) which are
extended by spring force.
The locking pins (7) are pushed into the cutouts (4) of the telescopic section
above at the locking points – the telescopic section is locked.
The telescoping cylinder is attached to the basic section (9) with the piston
rod (8). The telescoping cylinder has two locking pins (5) at the bottom and
a mechanism at the top (10).
When the telescoping cylinder is positioned at a locking point:
– The locking pins (5) can be extended into the cutouts (6) – the telescoping
cylinder is locked.
– The mechanism (10) engages into the locking pins (7) and can retract
them – the telescopic section is unlocked.
Telescoping
process
This state should be the starting point for a telescoping process.
A telescoping processes consist of 4 steps:
s

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals