Crane operation
11.3 Crane operation with main boom
11 - 88 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
Locking the tele-
scopic section for
on-road driving
Once you have retracted the main boom for on-road driving, you must by
all means lock the telescoping cylinder in telescopic section
I so that the
axle loads are in accordance with the values in the
Driving mode table;
à Driving modes, p. 6 - 1.
If telescopic section
I was the last telescopic section to be retracted, you can
select locking directly.
If another telescopic section was retracted last, you must do the following
before selecting locking:
– Unlock the telescoping cylinder;
à p. 11 - 79,
– Move the telescoping cylinder into telescopic section
I; à p. 11 - 82 and
– lock the telescoping cylinder;
à p. 11 - 83.
S
Risk of damage to the telescoping cylinder!
Move the control lever until the telescopic section is locked and set down –
the symbol
* must be yellow.
This prevents the load from exerting pressure on the telescoping cylinder
and allow the load to be enabled for fixed lengths.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals