Rigging work
12.6 Outriggers
Operating Manual GMK6300L 3 112 xxx en 12 - 47
xx.xx.xxxx
– Outrigger control units
The assignment to the carrier corresponds
to the top view.
Due to the position of the control units, the
displays on both sides differ.
In this example, the carrier would be stand-
ing higher to the rear on the right hand side.
Prerequisites The following prerequisites apply to manual and automatic alignment.
The main boom must be resting on the boom rest.
Or
– the main boom must be raised and
– the load must have been set down and
– the superstructure must be in the 0° or 180° position.
s
G
Risk of overloading the main boom!
Always slew the superstructure to the 0° or 180° position and set down the
load before levelling the truck crane.
In other positions, the deformation of the carrier will distort the indicated
inclination and the truck crane will be at an angle. This could cause the
boom to become overloaded during crane operation.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals