Rigging work
12.9 Other rigging work
12 - 116 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
Folding in
• Open the locking bar (2), then open the
locking bar (1) and fold in the railings (3).
You can additionally fold out the railings (1) for rigging work. Always fold in
the railings for crane operation.
(A) – Folding out
• Release the locking bar (2) and swing the
railing (1) outward until it engages.
(B) – Folding in
• Release the locking bar (2) and swing the
railing (1) inward until it engages.
G
Danger of accidents through folded out railings without a rigged counter-
weight!
The railings only function as fall protection when the counterweight is fully
rigged. Fold out the railings only when the counterweight is fully rigged.
This prevents you from falling off the turntable.