132
Chapter 4 Manual OS Installation
14 Installing high reliability tools.
To ensure stable server operation, refer to "Chapter 6 High Reliability Tools" (Jpg.175) and
install high reliability tools. Please install the Global Array Manager when you configure RAID.
The installation of Windows 2000 Server has completed.
● Before Starting Operation
After OS installation, refer to "Chapter 5 Operations after OS Installation" (Jpg.141) and perform the
necessary procedures.
4.2.4 Installing Linux
For the use of Linux, refer to the Fujitsu PRIMERGY website (http://primergy.fujitsu.com).