GE HEALTHCARE
D
IRECTION 5305880-100, REVISION 3 LOGIQ™ 100 PRO SERVICE MANUAL
Chapter 10 - Quality Assurance Page 10-7
Section 10-5 System Periodic Maintenance
10-5-1 Preliminary Checks
The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Step Item Description
1 Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
2 Paperwork
Fill in the top of the Periodic Maintenance (PM) Inspection Certificate. Note all probes and system
options.
3 Power up
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
power up to verify that no warning or error messages are displayed.
4 Probes
Verify that the system properly recognizes all probes.
5 Displays
Verify proper display on the monitor.
6 Presets
Take printout of all customer presets as a backup.
Table 10-6 System Preliminary Checks
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5305880-100TPH_r3.pdf Page 178 of 197