EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ 100 PRO

GE LOGIQ 100 PRO User Manual

GE LOGIQ 100 PRO
196 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #76 background imageLoading...
Page #76 background image
GE HEALTHCARE
D
IRECTION 5305880-100, REVISION 3 LOGIQ™ 100 PRO SERVICE MANUAL
Page 4-2 Section 4-1 - Overview
Section 4-2 General Procedures
4-2-1 Power On/Boot Up
Note: After turning off the system, wait at least ten seconds before turning it on again. The system may
not be able to boot if power is recycled too quickly.
CAUTION SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The
covers are required for safe operation, good system performance and cooling purposes.
4-2-1-1 System Boot-UP/Shutdown
Purpose: This is a description on how to Shut Down/Power-UP the system.
4-2-1-2 Lockout/Tagout Requirements (For USA/Europe)
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the plug.
4-2-1-3 Power Up
1.) Connect the Power Cable at the rear of the System.
2.) Connect the Power cable to an appropriate mains power outlet .
Figure 4-1 Mains Circuit Breaker and Mains Power Cable
Mains Power
Cable Connector
Circuit Breaker
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5305880-100TPH_r3.pdf Page 77 of 197

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ 100 PRO and is the answer not in the manual?

GE LOGIQ 100 PRO Specifications

General IconGeneral
BrandGE
ModelLOGIQ 100 PRO
CategoryMedical Equipment
LanguageEnglish

Related product manuals