Rev. 2.0
Maintenance Guide
1-41
1-6-6. Assembling the Cable
1) Apply the GERALYN grease (MGREAS400GA) to portions where the cables (XY
veyor-cable (XY veyor-cable XL), 1394 robot cable and the optical fiber cable 7M) are put in
the cableveyor.
2) Arrange the cables as shown in Figure 1-6-6-1 and adjust their lengths.
Figure 1-6-6-1-1
Figure 1-6-6-1-2
5-gang XY veyor-cable
assembly
(40113621)
Y cableveyor assembly
(40113623)
1-gang XY veyor-cable
assembly (40113622)
(KE-3020VR specifications)
Air tube (black,
8)
(40054839)
1600mm × 2
Cover side Head
side
Air tube (blue,
6)
(BT0600400EC)
1600mm × 2 pcs.
Outlet on cableveyor head side, M:L specifications
XY veyor-cable
assembly XL
(40092637)
Y veyor-cable
assembly XL
(40092638)
Air tube (black,
8)
(40054839)
1600mm × 2
Cover side
Head
side
Air tube (blue,
6)
(BT0600400EC)
1600mm × 2 pcs.
Outlet on cableveyor head side, XL specifications