Crane operation
11.2 Operation of the rated capacity limiter
11 - 28 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
Entering the RCL
code
You must enter the RCL code for the rigging mode according to the Lifting
capacity table
.
• Refer to the Lifting capacity table for the current rigging mode. The corre-
sponding RCL code (1) is specified at the bottom of the table (e.g. 1100).
• Press button (3) once – symbol is green.
• Press button (1) or (2) repeatedly until dis-
play (4) shows the required RCL code.
or
• Select the RCL code with switch (5).
The other displays will show the corre-
sponding rigging mode.
Now you can enter the reeving and accept the
rigging mode.

Table of Contents

Other manuals for Manitowoc Grove GMK6300L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK6300L and is the answer not in the manual?

Manitowoc Grove GMK6300L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK6300L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals