5-27
TMS9000-2 OPERATOR MANUAL LUBRICATION
Published 02-21-2019, Control # 611-05
Monthly Lubrication Work
Pins
Lubricate the following:
- the pins for the pin connection on the lattice
extension,
- the retaining pins on the return pulleys,
- the retaining pins used for fastening the lattice
extension sections for transport,
- the spring latch on the run-up rail.
NOTE: The lubrication interval applies to average
operation. Also, lubricate the pins after high-
pressure cleaning and generally at an interval that
will prevent them getting dry.