GROVE 6-13
TMS9000-2 OPERATOR MANUAL SET-UP AND INSTALLATION
6
Published 02-21-2019, Control # 611-05
20. Enter the current rigging mode on the RCL, refer to
Enter rigging mode, page 4-44.
21. With the RCL adjusted accordingly, rig the
counterweight combination required for the operation
according to Lifting capacity table, refer to Rigging the
counterweight, page 6-18.
22. Enter the current rigging mode with the newly rigged
counterweight combination on the RCL, refer to Enter
rigging mode, page 4-44.
Unrigging
NOTE: This procedure is not complete. There are
accompanying operating instructions which are
indicated by cross-references.
Observe the warnings and safety instructions
specified there!
1. With the RCL set correspondingly, unrig the
counterweight, refer to Unrigging the counterweight,
page 6-19.
2. Enter the current rigging mode with the newly rigged
counterweight combination on the RCL, refer to Enter
rigging mode, page 4-44.
3. Depending on transport:
- Attach the hook block to the bumper, refer to Hook
block on the bumper, page 6-30 or
- Set down the hook block and unreeve the hoist
rope;
Setting down the hook block, refer to Setting down
the hook block, page 6-31.
Unreeving hoist rope, refer to Unreeving hoist rope,
page 6-36.
4. Retract the main boom, refer to Extending/retracting,
page 4-67.
5. For on-road driving without trailer:
- Turn the superstructure to the 180° position to the
front with the RCL adjusted accordingly
- Place the main boom on the boom rest.
6. For on-road driving with a trailer:
- unrig the counterweight on the rear counterweight
platform, refer to Unrigging the counterweight, page
6-19.
- Set down the boom on a trailer with the RCL
adjusted accordingly and switch on the boom
floating position,
- switch on the swing gear freewheel,
- if necessary, switch on the boom pre-tensioning,
- switch off the 360° lock, refer to Switching the 360°
lock on/off, page 4-41.
7. Switch off the engine for crane operation.
8. If necessary, remove the anemometer and boom
position indicator light, refer to Anemometer and boom
position indicator light, page 6-40.
9. Fold in all mirrors for crane operation.
Swing the slewable spotlights, refer to Using the
slewable spotlights, page 4-86.
10. Retract the step (Figure 6-17).
11. After operating the truck crane on outriggers:
Retract the outriggers.
12. Inflate the suspension.
The symbol must be off (suspension inflated).
13. Switch the engine off
If there is no further work for the truck crane, refer to In case
of work breaks of more than 8 hours, page 4-89.
Removable Counterweight
For the TMS9000-2 truck crane, the counterweight
combinations are assembled from eight removable
counterweight sections. Use the following table and
FIGURE 6-18
8861-2

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove TMS9000-2 Series and is the answer not in the manual?

Manitowoc Grove TMS9000-2 Series Specifications

General IconGeneral
BrandManitowoc
ModelGrove TMS9000-2 Series
CategoryConstruction Equipment
LanguageEnglish

Related product manuals