EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove TMS9000-2 Series

Manitowoc Grove TMS9000-2 Series User Manual

Manitowoc Grove TMS9000-2 Series
430 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #394 background imageLoading...
Page #394 background image
SET-UP AND INSTALLATION TMS9000-2 OPERATOR MANUAL
6-58
Published 02-21-2019, Control # 611-05
Connecting the Anti-Two Block Switch
35 ft (10.5 m) Extension Anti-Two Block Installation
To electrically connect the anti-two block switch the electrical
connections to this extension must be completed, refer to 35
ft (10.5 m) Extension Electrical Connections, page 6-56.
1. Install the anti-two block switch assembly on to the pin
(1) (Figure 6-114) and secure it with a retaining clip.
2. Route the cable so that it will not be damaged during
crane operation, and connect the anti-two block
connector to the socket, with the same number.
35 ft (10.5 m) Extension Anti-Two Block Removal
When the extension is no longer needed or if installing the 23
ft fly extension for 58 ft extension operation, the anti-two
block switch must be removed.
1. Remove the anti-two block connector from the socket.
2. Install the cap on the storage socket.
3. Remove the retaining clip from the mounting pin and
remove the anti-two block switch assembly.
The anti-two block switch can now be moved to another
location and connected.
58 ft (17.7 m) Extension Anti-Two Block Installation
To electrically connect the anti-two block switch the electrical
connections to this extension must be completed, refer to 58
ft (17.7 m) Extension Electrical Connections, page 6-57.
1. Install the anti-two block switch (1) on to the pin (2) and
secure it with a retaining clip (Figure 6-115).
2. Route the anti-two block cable (3) such that it will not be
damaged during crane operation, and connect the anti-
two block switch to socket (4).
58 ft (17.7 m) Extension Anti-Two Block Removal
1. Remove the plug from the socket (4) (Figure 6-115).
2. Remove the anti-two block switch assembly (1) from the
pin (2).
3. Fasten the retaining clip to the anti-two block switch.
Extension Hydraulic Connections (Optional
Hydraulic Extension)
Disconnect the hydraulic lines from the boom nose
whenever the operation of the crane does not require
hydraulic power. This will extend the life of the hose drum,
hoses, and associated hardware.
Checking the Locking Device on the Hose Drum
The hose drum on the side of the main boom provides the
hydraulic supply to the boom nose/luffing boom extension.
The hose drum is equipped with a locking device. The drum
must be unlocked before operation.
If the hose drum has to be removed, the drum must be
locked.
1
9000
FIGURE 6-114
1
8969-25
FIGURE 6-115
1
2
3
4

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove TMS9000-2 Series and is the answer not in the manual?

Manitowoc Grove TMS9000-2 Series Specifications

General IconGeneral
BrandManitowoc
ModelGrove TMS9000-2 Series
CategoryConstruction Equipment
LanguageEnglish

Related product manuals